Demurrage vs Detention: What's the Difference?
- Demurrage — Charges for keeping a container at the port/terminal beyond the free days. The container is still within the port area.
- Detention — Charges for keeping a container outside the port (at your warehouse/factory) beyond the free days.
Typical Free Days at Indian Ports
- Import — 3-7 free days (varies by shipping line and port).
- Export — 3-5 free days for return of empty container.
Demurrage Rate Slabs (Typical)
Rates increase with each slab:
- Days 1-7 after free period: ~$50-100/day per TEU
- Days 8-14: ~$100-200/day per TEU
- Days 15+: ~$200-400/day per TEU
Tips to Avoid D&D Charges
- Clear customs documents before vessel arrival.
- Negotiate extra free days with your shipping line.
- Use Eximly's port congestion alerts to plan around delays.
- Set up automated demurrage alerts in Eximly — get warned before free days expire.